Energy and decarbonisation projects tend to produce some of the clearest R&D stories we see, mostly because the physics doesn’t care how much a team wants something to work. A hydrogen storage system, a wind or tidal generator component, a battery chemistry aimed at a specific use case — the target is usually well-defined (more efficient, higher output, lighter, cheaper, safer), and the gap between “we know this should be possible” and “we know how to actually do it reliably” is often the entire project.
Typically, a team sets out to improve on an existing approach — a more efficient way to convert or store energy, a component that has to survive conditions the standard version was never designed for, a process that needs to scale from a bench-top prototype to something running continuously in the field. The early models suggest it should work. Building it in the real world says otherwise: materials degrade faster than expected under real thermal cycling, a control system that behaved in simulation oscillates unpredictably on the actual hardware, a manufacturing process that’s fine at small scale introduces defects once volumes go up.
What follows is usually a long stretch of testing, failure, and redesign that never quite makes it into the pitch deck — swapping materials, rebuilding test rigs, re-running trials because the last one revealed a problem nobody had modelled. That process, not the final spec sheet, is where the eligible R&D actually sits.
There is one common theme across this sector: a lot of these projects involve partners, subcontractors, or components sourced overseas, which is exactly where the current rules get complicated. We spend real time working out which parts of that collaborative structure are actually eligible, because in energy projects particularly, it’s rarely all or nothing.